AC Solar PV Integration
AC Solar PV Integration covers NEC 705 interconnected electric power production sources, UL 1741 listed inverter requirements, and detailed installation steps for PV breakers, conductor landing, CT installation with proper orientation and routing, plus verification and commissioning procedures.
On this page
Code Reference (NEC)
- NEC 705 – Interconnected Electric Power Production Sources
- NEC 690.12 – Rapid Shutdown (PV-side, inverter dependent)
- NEC 705.12 – Load-side interconnections
- NEC 110.3(B) – Installation per listing and instructions
Requirements
- UL 1741 SA listed inverter
- PV breaker ≤ 100A
- Utility interconnection approval completed
Installation Steps
- Install the PV Breaker
- Install the PV breaker in the designated AC-PV breaker slot
- Do not relocate or substitute breaker positions
Land Inverter Conductors
- Terminate inverter output conductors at the PV breaker
- Verify conductor sizing per inverter specifications
- Torque terminals to manufacturer requirements
Current Transformer (CT) Installation
Install PV CTs
- Install PV CTs on the inverter output conductors
- Use only the provided or approved CTs
CT Orientation
- Orient CT arrows toward the Smart Panel
- Ensure CTs are fully closed and latched
CT Lead Routing
- Route CT leads through the low-voltage channel only
- Do not run CT wiring alongside high-voltage conductors

Verification and Commissioning Checks
App Verification
- Confirm PV production is visible in the Kora app
Electrical Verification
- Validate CT polarity
- Verify no overcurrent conditions