Code Reference (NEC)
- NEC 702 – Optional Standby Systems
- NEC 445 – Generators
- NEC 250 – Grounding and bonding
- NEC 110.20 – Transfer equipment ratings
Generator Requirements
- Single-phase residential generators
- Compatible start/stop control (if auto-start)
- Proper grounding and neutral configuration
- ≤ 20 kW
Installation Steps
- Install generator breaker in designated slot
- Land L1, L2, Neutral, Ground on designated terminals
- Install generator CTs if required
- Connect auto-start wiring if applicable
- Keep auto-start wiring isolated from HV conductors

Testing
- Simulate outage
- Confirm generator start and load acceptance
- Verify priority circuits behave correctly